Our current expereinced with new dimension WWTP that a 4million dolars for CAPEX is enough to cover the 1.032 connections do away with oxidising ponds and sludge issues at real time this currently in operation in Illinos  US....Viroment.com..

Published by

Our current expereinced with new dimension WWTP that a 4million dolars for CAPEX is enough to cover the 1.032 connections do away with oxidising ponds and sludge issues at real time this currently in operation in Illinos  US....Viroment.com..